1.23.2010






All the appliances are in aside from the range hood which arrives sometime next week. the 12' long butcher block counter (on the right) will be going in Monday, and I'll be pouring the pre-cast concrete counter tops shortly after. We still havent put away any of our kitchen things since the plywood still needs to be installed on the ceiling. That should be taking place by the end of next week.

No comments:

Post a Comment