The status of apartment 1 is: a mess.
But we are on schedule with completing the work by September.
Now it's up to us to figure out finish floor material. Were planning on bamboo @1.89/sq ft, and in the kitchen outdoor deck paint on plywood floor. Kind of like our bedrooms on the top floor, but possibly oil based for a more substantial coat.
7.16.2010
6.25.2010
Intermission...
It's been months since I've updated, lots of little finishing touches on our apartment. Soon I will upload some videos of phase II, a much more extensive renovation.
In the meantime, here are a few pics of our outdoor spaces.
In the meantime, here are a few pics of our outdoor spaces.
6.03.2010
Stairway
Two months since my last post! Well, to conclude 3 Highland Phase I, we did some exterior work, which involved building this staircase. We were seeking a safe way to get to the roof that wasnt a rickety ladder. Ama and I build this alternating tread staircase that's shape was calculated based on ama's stair stride. Now we are figuring out a way to incorporate a railing. Updates and better pictures will follow!
4.01.2010
bathroom on a sunny day
You probably haven't seen too much work being done in the bathroom off the kitchen, but we basically gutted the entire room over the last month and a half. It's come a long way!
we:
- Exposed a swath of brick wall
- Retiled the tub surround and added a shampoo shelf (tile is American Olean's biscuit, found as overstock at BMRC),
- Installed fixtures...a new (but used) Toto toilet, a 1950's Crane co. medicine cabinet + matching wall-mount sink. also TP holder, towel ring, etc.
- Poured a concrete slab for behind-the-sink storage (this time we used high-density Quikrete, not as happy with results)
- Sheet rocked the ceiling adding an exhaust fan and new recessed lights,
- Installed a cork tile floor
- Installed vertical wainscoting (partially to hide the uneven walls, but also because it looks nice)
- Added a 3x3 glass block interior window to let afternoon light into the kitchen.
ps. the folding chair in the first picture was found in the basement of the house, and on the back of it reads Highland Company. Not sure what the connection to the neighborhood is, if any, but its a nice little chair nonetheless.
we:
- Exposed a swath of brick wall
- Retiled the tub surround and added a shampoo shelf (tile is American Olean's biscuit, found as overstock at BMRC),
- Installed fixtures...a new (but used) Toto toilet, a 1950's Crane co. medicine cabinet + matching wall-mount sink. also TP holder, towel ring, etc.
- Poured a concrete slab for behind-the-sink storage (this time we used high-density Quikrete, not as happy with results)
- Sheet rocked the ceiling adding an exhaust fan and new recessed lights,
- Installed a cork tile floor
- Installed vertical wainscoting (partially to hide the uneven walls, but also because it looks nice)
- Added a 3x3 glass block interior window to let afternoon light into the kitchen.
^the Crane Co. used to make beautifully shaped things! ... and anyone who lives in the area should go to Crane's Beach, also beautifully shaped
^cork... somewhat sustainably harvested, fairly durable, looks great, and very easy to install.
^The only thing remaining from day 1 is this aqua cast-iron bath tub, which is a shade of blue i don't think they make anymore. It was somewhat of a challenge to find a color pallette that wouldnt turn the room into a carnival, so we kept it simple. White on the wainscotting, and greyblue on the walls. the cork does it's own thing, and the brick ties in the concrete. its a very bright room, i sort of wish i spent more time in there.
what do you think?
ps. the folding chair in the first picture was found in the basement of the house, and on the back of it reads Highland Company. Not sure what the connection to the neighborhood is, if any, but its a nice little chair nonetheless.
3.30.2010
Pantry pass-through on first floor
Now it works! This could make putting away bulk foods a breeze.
Currently trying to workout the footprint of the cabinets in this
small kitchen- it's even more challenging now that this pass-through
came back to life. It's sill is at a height of 32" above the floor,
and a standard counter/base cabinet height is 36". Any ideas on how to
configure this corner?
Currently trying to workout the footprint of the cabinets in this
small kitchen- it's even more challenging now that this pass-through
came back to life. It's sill is at a height of 32" above the floor,
and a standard counter/base cabinet height is 36". Any ideas on how to
configure this corner?
3.16.2010
3.02.2010
Small paint jobs
Painted the banister and stair window eggplant and the kitchen counter
shelf poppy red (to match the tiles)
shelf poppy red (to match the tiles)
All that's left is the second bathroom, which I'll start tomorrow.
Kitchen backsplash
3500 miles, 96 handcut tiles (hand counted and inspected at SFO
security), 50% off discontinued color, 12 square feet, 1 step closer
to being done.
security), 50% off discontinued color, 12 square feet, 1 step closer
to being done.
2.20.2010
2.17.2010