Roof and skylight repair
This house is built solid, so adding up to 8" of soil could happen without changing the structure. I'm thinking about 30% of the roof should be a deck/cabana and the remainder becomes a lush landscape. Also having visions of a lightweight fabric privacy structure to help protect any future sunbathing.
We have ordered replacement glass skylights instead of keeping with the acrylic bubble ones. The small skylight will be operable to improve air ventilation in the summer months. And glass will let us see views of the sky all year round.
Will update with finish shots in 2 weeks, when the skylights arrive.
12.29.2010
12.28.2010
Goodbye exposed brick
In an effort to improve the R-value (insulation) on our northern wall in the kitchen we decided to wrap the plywood onto the exposed brick wall. We were also vacuuming twice a week because of all the calcium that was flaking off the bricks. Exposed brick sounds cooler than it is!
This project will surely fix both problems while adding even more oak to the kitchen. Trying to make it a 1-day job, and things are looking good!
12.20.2010
devinylizing
11.06.2010
Mid construction
.
Deck replaced
Kathy was in charge of the saws-all, and all fingers are still in tact.